The purpose of requiring a Building Permit is to verify compliance with the Statewide Uniform Construction Code. Please review your options carefully so that you chose the correct application for your permit.
Applicant submits a completed application and required information including permit fee to Curtis O'Neil/Light Heigel Assoc, (570) 524-7742 | (570) 452-2545 | curtiso@light-heigel.com. He will review the submittal for code compliance (usually within 3 – 5 days)
Permit fee is assessed and paid
Applicant is contacted for further information, if necessary
Permit is processed and sent to applicant.
When Do I Need a Permit?
The Following are “examples” only. Permits are not limited to this list.
New homes
Additions to homes
Detached garages
Garages-attached or integral
Decks
Deck roof/porch roof
Porches - with or without roof structure
Chimneys
Remodeling - Any remodeling or alterations of the house which involves changing the structure or supporting members, such as creating new window or door openings, as opposed to replacing windows or doors
Roof - changes to the roof (such as adding dormers or in changing from a flat roof to a gable roof)
Sheds - utility sheds
Swimming pools - in-ground pool and above ground pools that ore over 24" deep
Spas/hot tubs - indoors and outdoors
Finished basements-permits are required when new walls, doors, windows, bedrooms, or other passageways are created
Plumbing/mechanical/electrical installations in new homes or additions
Mobile homes
New electrical work that is not a repair or replacement of existing systems.